Google Sheets: ERROR: Maximum call stack size exceeded

Hey @drivn,

The full output would be the full execution output, There are just bits of information and it would be handy to have the execution output showing the write binary time and the spreadsheet time to narrow it done.

The assumption at the moment is it could be taking time to create the spreadsheet file.

Hey @Jon and @netroy thank you for all the support, eventually I figured out that I was using the workflow wrongly. The output of the “concatenateItems” was only 1 item with a big array inside of it. Because of this the file writing put everything in 1 row instead of making a row for each item.

Right now with the modifications it seems to be working correctly :smiley: Even though its still taking up to 13 minutes (can we somehow make this faster??) because the “compare datasets” is taking a long time now, the output is a lot better.

2 Likes

This topic was automatically closed 7 days after the last reply. New replies are no longer allowed.