Hi everyone,
While working on our workflows, we noticed the following message under the execute sub-workflow configuration:
“Run once for each item” is deprecated and will be removed in a future version. To run the sub-workflow once per item, add a “Loop Over Items” node before this node and use “Run once with all items”.
Since we use n8n in an enterprise/company environment, this change will potentially impact the majority of our existing production workflows. Updating all of them to use a Loop Over Items node will require significant refactoring.
What are your thoughts on this deprecation? I would really appreciate any additional details or context regarding this update, such as:
What is the rationale behind this change?
Is there an estimated timeline for when this option will be completely removed?
What are the recommended best practices for migrating large-scale workflows efficiently?
Thanks in advance for your insights!
What is the error message (if any)?
Please share your workflow
(Select the nodes on your canvas and use the keyboard shortcuts CMD+C/CTRL+C and CMD+V/CTRL+V to copy and paste the workflow.)
That text is a notice parameter shown when mode is each, and the each branch is still fully implemented in the current node version. No removal timeline has been published, and n8n usually introduces breaking changes to nodes behind a typeVersion bump, with existing nodes pinned to the version they were created with. Therefore, I would not start a mass refactor based on a notice alone.
To add some context on the rationale behind this change:
n8n is gradually moving away from implicit internal looping hidden inside individual nodes in favor of explicit canvas-level looping using the Loop Over Items node. Showing the loop structure clearly on the canvas improves execution visibility, makes error handling easier, and prevents accidental performance bottlenecks in enterprise environments.
As @Lopez mentioned, you do not need to panic or rush into mass refactoring:
Backward Compatibility: Existing workflows stay pinned to their node version (typeVersion), so updating your n8n instance will not break running production workflows.
Audit First: Use the n8n Public API endpoint (/v1/workflows) to scan your workflow JSONs and identify which specific sub-workflows use mode set to “each”.
Phased Migration: Only update workflows during planned maintenance windows or when you are already modifying them for other updates.
Hi @Elena_Lazar Welcome!
There is a date to plan against. n8n 3.0 is scheduled for October 2026, and its breaking changes page lists the Execute Workflow node under Changed node behavior with the line that 3.0 removes the older behavior. It does not yet say which behavior that covers, and n8n states it will add full details and migration guides as 3.0 approaches, so that page is the thing to track rather than the notice in the node.
Pinning is not a shield against a removal either. A pinned typeVersion holds a node’s behavior steady across versions of a node that still ships, and the same page removes the Function, Function Item and Item Lists nodes outright, which nothing pinned survives. October 2026 is the horizon to size the audit against.
The audit first approach Anshul described will tell you which workflows to touch. The part that’s easy to underestimate once you’re actually doing the rewrite: Run once for each item and Loop Over Items plus Run once with all items are not guaranteed behaviorally identical, especially around error handling and any expression inside the sub workflow that assumed a single item context.
Since you will be touching most of your production workflows anyway, worth treating each migration as a small acceptance test rather than a refactor you eyeball. Before changing a workflow, capture a handful of real or representative executions and their outputs. After the rewrite, replay the same inputs and diff the outputs item by item, not just check that it ran without error. That catches the case where the loop runs fine and returns the right item count but a specific item’s result quietly changed, which across dozens of workflows is exactly the failure mode that is hard to catch by review alone.
Happy to share more detail on how we structure that kind of before and after check if useful.